youtube twitter facebook linkedin
Info@wonclean.com / 013 960 7988

Cleanroom Other products

Cleanroom partition system

The right angle corner system is a partition wall and floor, partition wall and partition wall, the angle between the partition wall and the ceiling is 90 ° compartment system connection ways.

Request a Free Quote
100% DemountableZero-downtime reconfig
Multi-CladdingHPL / 316L / PVC
90° Corner SystemConcealed pressure caps
ISO 14644Class 3–8 ready

 

Clean Room Partition System: Right-Angle HPL Wall System

The clean room partition system uses a right-angle corner method to join wall-to-floor, wall-to-wall and wall-to-ceiling at a sealed 90° — eliminating crevices that harbour particulates. As experienced hpl panels manufacturers and a Malaysia cleanroom manufacturer, we deliver both fixed and demountable partition system configurations.

It shares panel specifications with our HPL sandwich panel and clean room demountable partition wall, supplied within our modular cleanroom programme.

01 — Technical Specifications

Cleanroom Partition System Specifications

Standard configuration for the Wonclean cleanroom partition system. Core, cladding and frame are all customizable to project and cleanroom classification requirements.

Cleanroom Partition System — Standard Technical Data
Panel core Mineral wool (90 mm) or PU foam (75 mm), ≥ 120 kg/m³ (calcium silicate option)
Cladding 0.8 mm pre-lacquered steel (RAL 9016) (HPL 13 mm / SS316L / antimicrobial PVC options)
Joint system Continuous silicone gasket + aluminum pressure cap (EPDM / welded options)
Structural frame Anodized aluminum 6063-T5, demountable (reinforced steel for > 150 kg FFU)
Corner system 90° right-angle wall/floor/ceiling connections
Ceiling integration Standard grid compatible, recessed mounting, HEPA hatches, cable channels
Fire rating ASTM E84 Class A · BS 476
Compliance ISO 14644-1 Class 3–8 (USP <797>/<800>, EU GMP Annex 1 options)
Cleanliness grade ISO 14644-1 Class 3–8 ready

Values shown are standard/representative configurations. Confirm final certified figures (fire test, leak test) against the project datasheet before specification — Wonclean issues a stamped datasheet with every quotation.

02 — Construction

Cleanroom Partition System Construction

The 100% demountable framework is the engineering secret. Non-combustible mineral wool or PU cores bond to anodized aluminum frames with concealed pressure-cap joinery — enabling panels to be reused and reconfigured with zero downtime, in a choice of cleanroom-grade cladding finishes.

01
Cladding — Pre-lacquered steel, HPL, 316L stainless or antimicrobial PVC for particulate and chemical control.
02
Structural core — Non-combustible mineral wool or PU foam (≥ 120 kg/m³) for fire safety and rigidity.
03
Aluminum frame — Anodized 6063-T5 demountable frame with concealed pressure caps and continuous gaskets.
04
Service integration — Integrated lighting, FFUs and cable management with full BIM coordination.
03 — Why Specify It

Why Choose Our Cleanroom Partition System

Zero-downtime reconfiguration

100% demountable design enables rapid layout changes and panel reuse without facility shutdown.

Multi-cladding flexibility

HPL, stainless 316L, epoxy-coated steel or antimicrobial PVC address particulate and chemical needs.

Clean 90° joinery

Right-angle corner system with concealed pressure caps keeps junctions flush and gap-free.

Heavy FFU support

Reinforced steel subframe option carries FFU loads over 150 kg for service-dense ceilings.

Multi-standard compliance

ISO 14644-1, ASTM E84 Class A, BS 476, USP <797>/<800> and EU GMP Annex 1.

Fully documented

Full BIM coordination and documentation packages for design, validation and audit.

04 — Where It's Used

Cleanroom Partition System Applications

Specified as modular cleanroom partition walls across regulated and high-precision industries. See real cleanroom project case studies or browse the full cleanroom product range.

Cleanroom partition system installed with 90-degree corner connections
Modular cleanroom partition system with flush 90° corner connections.
ISO 14644 & SIRIMCleanroom-grade quality
Stamped DatasheetAir-tightness & fire report
Malaysia-BasedLocal engineering team
7×24 Support10-year structural warranty

Get a project-specific quote in 24 hours

Send your cleanroom classification, floor area and finish requirements. Our Malaysia-based engineering team replies with a stamped datasheet, fire certificate and pricing — 7×24 technical support by email, phone or WhatsApp.

Request a Free Quote Chat on WhatsApp
1

Where should air showers be installed in a cleanroom?

 Install between changing rooms and clean areas, or between ISO 8/ISO 7 classified areas and unclean areas. Personnel pass through after changing into cleanroom clothing but before entering the controlled environment

2

What is involved in the construction of a modular cleanroom?

To assemble laboratory spaces efficiently, modular components are preferred. An assembled cleanroom utilizes prefabricated sections to reduce on-site construction time. The underlying aluminum profile system provides the necessary framework for mounting panels and doors, ensuring precision alignment and structural rigidity throughout the facility.

3

What are the key considerations for air shower design?

Selecting the right air shower requires careful planning. Proper air shower design ensures effective personnel decontamination before entering controlled environments. Specifications depend on room size. Consulting an experienced air shower manufacturer helps determine optimal placement. Compliance with standards is essential. Regular maintenance schedules must be established to sustain performance over time.

4

What defines quality in clean room door systems?

Sealing integrity is vital. air tight sliding clean room doors prevent pollutants from entering. Each air tight sliding cleanroom door must meet pressure ratings. Reputable air tight sliding cleanroom door manufacturers provide leakage certification. Automatic mechanisms reduce human contact risks. Material selection prioritizes durability and ease of cleaning to meet hygiene protocols. Installation requires precise alignment.

CONTACT
Address
A-17-11, Tower A, Pinnacle Petaling Jaya, Jalan Utara C, 46200 Petaling Jaya, Selangor, Malaysia
Contact Info
013 960 7988
Email
Info@wonclean.com
cleanroom map

Leave a Message

Leave a Message

We'd love to hear from you. Send us a message and we'll respond as soon as possible
X