youtube twitter facebook linkedin
Info@wonclean.com / 013 960 7988

Cleanroom Sandwich Panels

PIR cleanroom panel

All panels are pre-finished, factory-sealed, and tested for particle shedding (ISO 14644-1 Class 5 compatible), VOC emissions (<5 µg/m³ formaldehyde), and structural load capacity (up to 250 kg/m² ceiling span). We design full assemblies — from Malaysia Cleanroom ceiling systems with integrated FFUs and lighting cutouts, to Malaysia cleanroom door frames with auto-closing mechanisms and interlocked access control interfaces.

Request a Free Quote
B-s1,d0 FireNon-dripping, low smoke
Low λ 0.022Thermal stability
Zero BowingNo off-gassing
ISO 14644Class 5 compatible

 

PIR Cleanroom Panel: Fire-Performance Insulated Wall System

The PIR cleanroom panel is precision-engineered for Malaysia's high-stakes industries, combining thermal stability, fire performance (B-s1,d0 Euroclass) and dimensional integrity in one insulated wall and ceiling system. As a vertically integrated Malaysia cleanroom manufacturer, we deliver it with full traceability.

It sits within our complete panel range alongside the clean room aluminum honeycomb panel, EPS cleanroom panel and HPL panels by experienced hpl panels manufacturers.

01 — Technical Specifications

PIR Cleanroom Panel Specifications

Standard configuration for the Wonclean PIR cleanroom panel. Facing, thickness and dimensions are all customizable to project and cleanroom classification requirements.

PIR Cleanroom Panel — Standard Technical Data
Panel type Polyisocyanurate (PIR) core sandwich panel
Core material Polyisocyanurate (PIR)
Fire rating EN 13501-1 B-s1,d0 (non-dripping, low smoke)
Thermal conductivity (λ) ≈ 0.022 W/m·K
Max panel size 1200 mm × 6000 mm
Surface finish 304 SS / anodized aluminum / epoxy-coated steel
Particle shedding ISO 14644-1 Class 5 compatible
VOC emissions < 5 µg/m³ formaldehyde
Structural load up to 250 kg/m² ceiling span
Climate design High-humidity & monsoon-resistant
Cleanliness grade ISO 14644-1 Class 5 ready

Values shown are standard/representative configurations. Confirm final certified figures (fire test report, load rating, VOC) against the project datasheet before specification — Wonclean issues a stamped datasheet with every quotation.

02 — Construction

PIR Cleanroom Panel Construction

The PIR core is the engineering secret. It resists compression creep to preserve gasket-seal integrity over time, while pre-finished factory-sealed assemblies and low-λ insulation deliver dimensional stability with zero bowing and zero off-gassing — even in monsoon humidity.

01
Outer facing — 304 SS, anodized aluminum or epoxy-coated steel; smooth, non-shedding, easy-clean cleanroom surface.
02
PIR core — Polyisocyanurate for low thermal conductivity, fire performance and compression-creep resistance.
03
Inner facing — Matched skin forms a sealed, zero-off-gassing two-sided cleanroom surface.
04
Factory-sealed assembly — Pre-finished, factory-sealed joints with integrated FFU and lighting cutouts available.
03 — Why Specify It

Why Choose Our PIR Cleanroom Panels

B-s1,d0 fire performance

Non-dripping, low-smoke PIR core provides reliable fire performance for regulated environments.

Dimensional integrity

Zero panel bowing and compression-creep resistance preserve gasket-seal integrity over the long term.

Low-λ efficiency

0.022 W/m·K thermal conductivity delivers strong insulation and stable cleanroom temperatures.

Zero off-gassing

Low VOC emissions (< 5 µg/m³ formaldehyde) protect contamination-sensitive processes.

Strong ceiling spans

Up to 250 kg/m² ceiling load capacity supports service-heavy and walk-on ceiling designs.

Monsoon-resistant

High-humidity design keeps panels stable through Malaysia's tropical and monsoon conditions.

04 — Where It's Used

PIR Cleanroom Panel Applications

Specified as cleanroom wall panels, ceiling panels and partition systems across regulated and high-precision industries. See real cleanroom project case studies or browse the full cleanroom product range.

ISO 14644 & SIRIMCleanroom-grade quality
Stamped DatasheetAir-tightness & fire report
Malaysia-BasedLocal engineering team
7×24 Support10-year structural warranty

Get a project-specific quote in 24 hours

Send your cleanroom classification, floor area and finish requirements. Our Malaysia-based engineering team replies with a stamped datasheet, fire certificate and pricing — 7×24 technical support by email, phone or WhatsApp.

Request a Free Quote Chat on WhatsApp
1

What is the proper procedure for using an air shower?

Enter, close outer door completely, stand in center, slowly rotate 360 degrees with arms raised for thorough coverage, wait for preset time (15-30 seconds), then open inner door and enter clean area

2

What Are the Core Materials and Specifications for Clean Room Panels?

Selecting the correct clean room panel material is critical for maintaining ISO standards across industries. Options include rock wool and aluminum. Detailed clean room panel specifications cover thickness, fire resistance, and surface smoothness. High-quality Clean room panels ensure structural integrity while meeting stringent environmental controls required for precision manufacturing processes.

3

How to Identify Reliable Manufacturers and Suppliers for Wall Systems?

Evaluating clean room panel manufacturers requires assessing certification records and capacity. A reputable clean room panel supplier provides support for integrating the clean room panel wall system into facilities. Teams should verify compliance with international standards before procurement. Proper selection ensures durability and minimizes maintenance costs across aerospace and automotive sectors.

4

What Distinguishes Partition Walls from Standard Partitioning Systems?

A clean room partition serves as a standalone divider, whereas a clean room partition wall offers structural support. Advanced clean room partitioning systems allow modular reconfiguration without compromising cleanliness. Solutions are vital for data centers and labs requiring flexible layouts. Installation must adhere to strict sealing protocols to maintain pressure differentials effectively.

5

Specialized Panels for Green Energy and Solar Film Production?

Facilities focusing on sustainability require clean room panels for green energy manufacturers designed with anti-static properties. Similarly, clean room panels for solar film manufacturers demand ultra-low outgassing materials. Using specialized clean room partition panels ensures product yield remains high. These support rigorous cleanliness classes needed for photovoltaic and battery production lines.

6

Understanding Pricing Factors and Partition System Configurations?

The clean room panel price varies based on material density, fire rating, and dimensions. A comprehensive Clean Room Partition System includes doors and profiles affecting budget. Comparing different clean room partition systems helps optimize costs without sacrificing performance. Food and beverage sectors prioritize washability, influencing final selection and expenditure planning for construction projects.

7

How to choose the right door for a controlled environment?

Selecting an aluminum clean room door depends on traffic flow and pressure requirements. Proper Aluminum frame door Design ensures airtight sealing to maintain pressure differentials. For high-traffic areas, automatic clean room doors reduce contamination risks by minimizing physical contact during entry and exit processes in critical zones.

8

Which wall panels offer the best protection against damage?

Aluminum Clean Room Wall Panels are engineered for impact resistance and easy cleaning. The Aluminium honeycomb gypsum panel combines fire resistance with structural stability. An Anti-fold special panel further enhances durability in corners, ensuring long-term performance without compromising the sterile conditions required for pharmaceutical or electronic manufacturing.

9

How does air purification impact clean room efficiency?

Effective air purification is critical for maintaining ISO standards. High-quality air filter units remove particulates from the circulation system. Large scale air purification projects require detailed planning regarding airflow patterns. Integration with HVAC systems ensures consistent environmental control. Monitoring particle counts validates effectiveness. Upgrading filtration media enhances safety and product quality within sensitive zones.

CONTACT
Address
A-17-11, Tower A, Pinnacle Petaling Jaya, Jalan Utara C, 46200 Petaling Jaya, Selangor, Malaysia
Contact Info
013 960 7988
Email
Info@wonclean.com
cleanroom map

Leave a Message

Leave a Message

We'd love to hear from you. Send us a message and we'll respond as soon as possible
X